Sutton Wick – Pump Electrification Project
Sutton Wick Case Study Client: CEMEX Project Value: £400K Project Period: AUGUST 2021 TO NOVEMBER 2021 At their Sutton Wick closed landfill site, Cemex have a working Methane Stripping Plant but the leachate delivery from the well heads was not closely integrated. Cemex decided to change their pumps and control system to better integrate the