Biological commissioning of the Hatfield LTP is well underway with seed sludge being introduced last week. Throughput is already nearing capacity and we expect to be up at capacity by the end of the week. Final touches are being undertaken to the installation, including fencing, pipework trace heating and lagging. Keep an eye on our Case Studies as we will be adding a new one soon for the Hatfield LTP.