Latest News
PARKWOOD LEACHATE TREATMENT PLANT REFURBISHMENT
Phoenix has been awarded the Parkwood LTP refurbishment contract by Viridor Waste Management. These works involve design, manufacture and erection of new galvanised steel access steps to existing steel platforms in order to improve safe access. In addition to this
PHOENIX PASSES ANOTHER NICEIC ASSESSMENT
The annual inspections were undertaken in two parts with an office review where many aspects of the amendment three changes were discussed. Then later a site review on one of our major installations. There were no non-conformances at either inspection.
WALPOLE LEACHATE TREATMENT PLANT CHEMICAL DOSING SYSTEM REFURBISHMENT
Walpole LTP chemical dosing system refurbishment is the third upgrade that Phoenix is undertaking for Viridor at its existing Leachate Treatment Plants. The new reinforced concrete support base has been constructed and the sodium hydroxide storage tank has been delivered
NEW CASE STUDIES LOADED
Latest case studies loaded: Hatfield Case Study Shelford Case Study Viridor LTP Refurbishment Contracts Case Study
HATFIELD LEACHATE TREATMENT PLANT BIOLOGICAL COMMISSIONING
Biological commissioning of the Hatfield LTP is well underway with seed sludge being introduced last week. Throughput is already nearing capacity and we expect to be up at capacity by the end of the week. Final touches are being undertaken