Deep Moor Landfill Leachate Treatment Plant Refurbishment Case Study

By |2022-12-09T18:27:18+00:00December 9th, 2022|Case Studies, News|

At their Deep Moor landfill site, CoastalUK had a working Leachate Treatment Plant. But due to the age of the plant, the performance was not good, and it was decided to investigate an upgrade. DEEP MOOR Leachate Treatment Plant Refurbishment Contract A construction contract was awarded to Phoenix by CoastalUK under the NEC4 Engineering and

Bennadrove Leachate Treatment Plant Update 2022

By |2022-11-02T20:43:30+00:00November 2nd, 2022|Case Studies|

Over the course of our involvement at the Bennadrove Landfill Site near Stornoway, which spans well over 20 years, Phoenix has designed and installed many updates and additions to the leachate treatment facility at the landfill site. In this case study, we report on our latest work. The landfill site has for some years now

Sutton Wick – Pump Electrification Project

By |2022-12-09T18:16:10+00:00September 28th, 2022|Case Studies|

Sutton Wick Case Study Client: CEMEX Project Value: £400K Project Period: AUGUST 2021 TO NOVEMBER 2021 At their Sutton Wick closed landfill site, Cemex have a working Methane Stripping Plant but the leachate delivery from the well heads was not closely integrated. Cemex decided to change their pumps and control system to better integrate the

Longford Methane Stripping Plant Case Study

By |2022-09-28T19:38:32+00:00September 12th, 2022|Case Studies, News|

Client: CEMEX Project Value: £200K Project Period: AUGUST 2020 TO OCTOBER 2020 The Longford methane stripping plant was designed and built by Phoenix Engineering (Phoenix) for CEMEX. Located at the closed Longford Landfill Site near Slough. The works also included cabling to well heads to supply power and integrate pumping with the MSP controls. Contract