New Case Study: Cumbria MSPs Case Study
Click here to view this case study:
Click here to view this case study:
To view this case study, click here:
Phoenix has successfully completed refurbishment of the Dry Lane Methane Stripping Plant for Cumbria Waste Management to programme and budget.
Phoenix has successfully completed refurbishment of the Redhills Methane Stripping Plant for Cumbria Waste Management to programme and budget.
Phoenix has now completed the full MEICA installation of the Lean Quarry LTP Raw Leachate Storage Tank works for Viridor at Lean Quarry Landfill Site. The new SCADA and control system provides control of leachate extracted from the site and tankered leachates in the storage tanks, from where it is delivered to the LTP for
Congratulations to our Tim Robinson who came 663 in the Berlin Marathon with an incredible time of two hours, forty nine minutes and three seconds. Another amazing performance at an international marathon with some 44,000 participants and where a new world record of two hours one minute and thirty nine seconds was set.
Phoenix has been awarded the contract to refurbish and upgrade the Dry Lane and Redhills Methane Stripping Plants for Cumbria County Council and Cumbria Waste Management. Both Cumbria County Council and Cumbria Waste Management acknowledge the requirement to proactively maintain both facilities after a number of successful years operation. Bringing both facilities up to latest
Tonight at 9pm on BBC4, a new show examining the legacy of landfill sites across the UK is being aired. The show looks at the history of dumping waste in landfill over the last 50 years and hopes to shed light on the waste we throw away, in light of greater public awareness of the
Following recent completion of the high pressure water supply ring main to the Woodsmith Mine and the Office and Welfare water supply booster set design and installations at Lockwood Beck, Phoenix has now been awarded work to install the mains water supply at the Sirius Office and Welfare Facility in Teesside at Wilton International.
Phoenix Engineering has been awarded the contract for design and build of MEICA works at the Lean Quarry Landfill Site raw leachate storage and reception facility. The site is operated by Viridor Waste Management. The contract includes all MEICA works and steel design and fabrication of the access platform and steps to the storage and